We are proposing a multi-million-pound investment in new facilities and enhanced green spaces around the hotel site. A local employer and successful hotel, we are proud to be part of the community. Pendley Manor is valued by visitors and the wider community, but we are constrained by our current facilities. Our new proposals would enhance our offer to guests through improved hotel space and outdoor areas.

It would also improve our business conference, wedding facilities and community event space, and provide new revenue streams. This package of improvements, phased over several years to reduce impact on visitors and neighbours, would help to secure the hotel’s future success.

Click here to see our full consultation boards

New Facilities & Event Spaces

The proposals to enhance Pendley Manor are ambitious and reflect our long-term aim to enhance our offering to guests and the local community. We are respectful of our historic setting and the proposals include:

  • New hotel building on the western side of the main hotel site, comprising 40 keys. The Harcourt Wing extension will be reconfigured to provide 23 additional new keys.
  • New events space/ballroom with a landscaped roof, connecting directly to the Harcourt Wing. This will upgrade our existing spa and leisure facilities.
  • A new entrance link corridor to connect the main building with the enhanced Harcourt Wing.
  • Restore and extend ‘The Lodge’, our historic gatehouse, to provide a new social hub including an open kitchen area for cooking classes, and a flexible space for arts and crafts.

These additions will support our growing demand for weddings, conferences, and cultural events.

further information

Access and Travel

Pendley Manor benefits from close access to bus routes which link to Tring and the railway station. The proposals can enhance these connections via improved walking and cycling routes to increase accessibility and promote wellbeing.

  • Realignment of the entrance road to improve the approach to Pendley Manor
  • A network of pedestrian walking routes and paths which link to those outside of the site. These will link with external bus stops to encourage sustainable travel to Tring and the railway station
  • Improved formal cycling path across the site
  • Additional parking (+70 net spaces) with a new area at The Meadow, including new EV charging points, accessible bays, cycle parking, and guest spaces
further information

Benefits

This exciting redevelopment brings a range of benefits for guests, staff, and the wider community:

  • Enhanced facilities to secure the upkeep and long-term future of the historic Pendley Manor hotel
  • Improved green spaces for recreation and enhanced biodiversity net gain
  • Phased development to reduce impact on visitors and neighbours
  • Permanent event, wedding, and business conference spaces to improve our offer and secure vital revenue streams
further information

Scope of work

The planned works are extensive but carefully phased to preserve our operations. They include:

  1. Existing leisure and spa facilities to be removed. New events space and leisure facilities to be introduced on ground and basement floors
  2. The existing external canopy and E link of the Harcourt Wing will be demolished to create a new link corridor connecting the main building, improving circulation and enhancing the north elevation and entrances with thoughtfully designed landscaping
  3. Second floor of Harcourt Wing extension converted to house guestrooms
  1. External bin store of Harcourt Wing relocated to basement level
  2. First floor of Harcourt wing extension to be reconfigured to provide questrooms. Ground floor to be reconfigured to provide new events entrance and ancillary features
  3. Excavation of soil is proposed to accommodate a new three-storey bedroom block, adding 40 additional guestrooms

Timeline

  1. 2026

    Phase 1: Upgrades to The Meadow Car Park
    Phase 2: New ballroom and Harcourt Wing improvements

  2. 2027-2028

    Phase 3: Removal of Paddock House & landscaping
    Phase 4: Refurbishment of The Lodge

  3. 2028-2029

    Phase 5: Construction of new hotel building

Public consultation – have your say

Thank you for reviewing our public consultation materials. You can provide feedback in the following ways:

Attend our public drop-in exhibition: Wednesday 30th April 2025 (3pm-8pm) at the Simon Suite, Pendley Manor Hotel, Cow Lane, Tring, HP23 5QY.

You can also complete a feedback survey by clicking the below button. Thank you for your feedback, which is greatly appreciated.